TM5-1260-206-34
Connectors Maintenance Procedures - Continued
Table 2-11.
STEP
ITEM
NO.
PROCEDURE
REMOVAL
Strain relief clamp (1)
5
Loosen two screws (2) and remove clamp.
Connector
6
Disassemble by doing the following:
a. Plug connector into mating chassis connector to prevent it
from rotating.
Rotate strain relief shell (3) counterclockwise. For MS
b.
connectors grasp retaining ring with pliers to prevent it
from turning.
c. Unsolder and tag with destination all wires connected to
pins. Remove cable.
Remove strain relief shell and rubber boat (5).
d.
REPLACEMENT
Connector
7
Reassemble by doing the following:
Slide rubber boat and strain relief shell onto cable. Insert
a.
cable through retaining ring (MS connectors) and collar (6).
Resolder wires to connector pins according to destination labels.
b.
For MS connectors slide retaining ring over connector head
c.
(7) and engage threads.
Plug connector into mating chassis connector to prevent it
d.
from rotating.
Slide rubber boat and strain relief shell towards connector
e.
head and tighten. For MS connectors grasp retaining ring
with pliers to prevent it from turning.
8
Strain relief clamp
Replace and secure with two screws.
2-50