TM5-1260-206-34
Table 2-10.
APPS System Fine Alignment Procedures - Continued
STEP
ITEM
NO
PROCEDURE
Rotate adjust
Y Display
Observe
Adjust
screw (14)
indication
Counter-
g.
clockwise
High-to-low
transition
on center
grid line
h.
Zero system. (See step 27.)
i. Repeat steps a. through f. as necessary.
Adjustments interact.
Perform X-Y Plot diagnostic. (See table 2-5.) If Y STD is
j.
still out of tolerance, repeat steps 23 through 28 using a
different zero reference point.
ALIGNMENT KIT REMOVAL
29
Precision alignment assembly (7)
The precision alignment assembly is a
Remove by doing the following:
a.
Push in meter rod (1) and hold
with finger. Slide lock lever
(2) to right to cover tip of
meter rod. Slowly release meter
rod until it contacts lock lever.
Disconnect spring (3) from bar
b.
post (4). Reconnect to storage
post (5).
Loosen clamp screws (9). Pull
c.
clamps free of base plate.
Remove alignment assembly.
d.
e. Rotate adjust screw (14) counterclockwise until push rod (12)
is even with alignment assembly.
2-47