INSTALLATION INSTRUCTIONS - To install the APPS, the OMS and TID
2-5.
components, p o s i t i o n a l l o t h e r u n i t s , a n d c o n n e c t t h e c a b l e s .
a . T o o l s , Test Equipment, a n d M a t e r i a l s R e q u i r e d f o r I n s t a l l a t i o n .
Assembly a n d i n s t a l l a t i o n o f t h e A P P S r e q u i r e s t h e u s e o f t h e s c r e w d r i v e r
found in c a s e 5 .
To assemble the APPS, do the procedures
b . Assembly of Equipment.
Inspect all cables for frayed insulation or other
cable used in the APPS.
visible defects.
Do not connect power cable W106 to the site AC power
Check that A.C. POWER S1 switch on DAC is set at OFF
b e f o r e making this connection.
T o connect the A P P S , remove cables (8 each) from case 3 and perform inter-
NOTE
Be sure to align key-ways before tightening connectors.
INITIAL ADJUSTMENTS AND DAILY CHECKS - T a b l e 2 - 3 i s a l i s t i n g o f
2-6.
i n i t i a l adjustments and daily checks. P e r f o r m t h e s e p r o c e d u r e s a f t e r
i n s t a l l a t i o n , a t t h e s t a r t o f a d u t y s h i f t , and whenever power is restored
Report all discrepancies
t o the APPS after an operational shutdown.
to your supervisor.
NOTE
All knurled screws are to be tightened only
finger tight.