TM 5-6675-312-14
c. Deprocessing Unpacked Equipment.
There are no special instructions required to deprocess the unpacked
equipment.
4-6. INSTALLATION INSTRUCTIONS.
a. Tools, Test Equipment, and Materials Required for Installation. Other than the screwdriver, adjusting pin, and tripod
allen wrench no other tools, test equipment or materials are required for installation.
b. Assembly of Equipment. To assemble the equipment refer to paragraph 2-6b.
c. Installation Instruction. To install the various major items on the equipment refer to paragraph 3-2.
Section III. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
4-7. INTRODUCTION. This section contains the organizational maintenance level preventive maintenance checks
and services.
4-8. PREVENTIVE MAINTENANCE CHECKS AND SERVICES.
Table 4-1 lists the preventive maintenance checks
and services.
Table 4-1. Preventive Maintenance Checks and Services
W - Weekly
Q - Quarterly
A - Annually
M - Monthly
S - Semiannually
INTERVAL
ITEM TO BE
ITEM
INSPECTED
PROCEDURES
NO.
WMQ
S
A
1
Shipping case
Inspect shipping case for
cracks, dents, defective
hinges and hasp.
2
Metal carrying
Inspect metal carrying case
case
hood and base for dents,
cracks, and rust. Inspect
4-2