TM 5-1260-206-12
Table 2-4.
APPS Operating Procedures
STEP
ITEM
NO,
PROCEDURE
EQUIPMENT TURN-ON
1
DAC
Set A.C. POWER S1 switch (1) at ON.
Check that ELAPSED TIME M1 meter (2)
operates, power indicators (3) and (4)
light, and blower operates.
NOTE
If sonalert sounds press
2
Calculator
3
OMS
Press S1 power switch.
Check that
overhead lamp lights.
Set power switch (1) at ON. Check
4
t h a t indicator (2) lights. Rotate
left and right lamp dimmers (3)
f u l l y clockwise. Check that left
a n d right illuminators light.
2-41