TB 55-1905-202-34/1
b.
Assemble indicator mounting plate (10, fig. 14)
and gasket (11) in place with appropriate mounting
NOTE
All welding and cutting is now
complete in pilothouse; print
a.
Locate and weld in
place the 15
weldnuts (9, fig.
touchups should be made at this
2) so
that the cable (49, fig. 1)
will be
routed and
time.
supported by cable clamps (8, fig. 7)
18