TM 5-6675-270-15
ORGANIZATIONAL MAINTENANCE lNSTRUCTIONS
RECEIPT OF EQUIPMENT
Section l. SERVICE
4-1. Inspecting and
Servicing the
4-3. Equipment
Conversion
Equipment
To inspect and service the theodolite, follow the
2-3.
For installation procedures, refer to paragraph
2-2.
Section Il. MOVEMENT TO A NEW WORKSITE
4-5. Reinstallation after Movement
4-4. Dismantling for Movement
For dismantling procedures, refer to paragraph
For reinstallation procedures, refer to paragraph
2-5.
2-4.
Section Ill. REPAIR PARTS, SPECIAL TOOLS, AND EQUIPMENT
special equipme It is required by organizational
personnel for performing maintenance on the
Tools, equipment, and repair parts issued with or
theodolite.
authorized for the theodolite are listed in the
4-8. Maintenance
Repair Parts
4-7. Special Tools and Equipment
Repair parts and equipment are listed and illus-
trated in TM 5-6675-270-25P.
Section IV. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
(MONTHLY AND QUARTERLY)
4-10. Preventive Maintenance Checks
and Services
To insure that the theodolite is ready for operation
Table 4-1 contains a
tabulated listing of
preven-
at all times, it must be inspected systematically
tive maintenance checks and services to be
so that defects may be discovered and corrected
performed by orginizatioinal maintenance person-
before they result in serious damage or failure.
nel at monthly and quarterly intervals. A quar-
The necessary preventive maintenance checks and
terly interval is equal to three calendar months, or
services to be performed are listed and described
250 hours of operation, whichever occurs first.
The item numbers indicate the sequence of mini-
mum inspection requirements.