TM 5-6675-250-10
2-9.
PREPARATION FOR MOVEMENT - Continued
PUTTING SIAGL BACK IN SERVICE - Continued
UNPACKING EQUIPMENT - Continued
b . Transit Case
(1) Press pressure relief valve (1).
(2) Unfasten latches (2) securing upper
and lower sections.
(3) Remove upper section (3).
(4) Unfasten latches (4) and open clamps
(5) securing GRU in transit case.
(5) Remove GRU (6) from case.
(6) Inspect equipment for damage and
for loose or missing parts.
Auxiliary Equipment and Accessories
Transport Case
a. Dusting brush
b. Plumb bob assembly
c. Eyepiece prism (right angle)
d. Eyepiece sun filter
e. Spare lamps
f. Horizontal circle setting tool
g. Fuse
h. Rain or dust cover
Avoid exposure of the equipment to dust,
soil, or other abrasive materials.
2-64