TM 5-6675-250-10
2-5. ASSEMBLY AND PREPARATION FOR USE - Continued
UNPACKING EQUIPMENT - Continued
NOTE
Remove auxiliary equipment required for
operation from the transport case storage
compartments.
Transit Case
b.
(1) Press pressure relief valve (1).
(2) Unfasten latches (2) secur ing upper
and lower sections.
(3) Remove upper section (3).
(4) Unfasten latches (4) and open clamps
(5) securing GRU in transit case.
(5) Remove GRU (6) from case.
(6) Inspect equipment for damage and
for loose or missing parts.
Auxiliary Equipment and Accessories
Transit Case
a. Dusting brush
b. Plumb bob assembly
c. Eyepiece prism (right angle)
d. Eyepiece sun filter
e. Spare lamps
f. Horizontal circle setting tool
g. Fuse
h. Rain and dust cover
2-29