(6) Pull upwards on the two base clamps (2,
theodolite. Remove the theodolite from the base
fig.3-2) that
secure the
base assembly (3) to the
assembly.
1. Alidade
3.
Base
assembly
2.
Base
clamp
(2
rqr)
4.
Screw,
machine
(spec)
(2
rqr)
3-2.
Theodolite
with
metal
hood
assembly
removed.