TM 11-6605-202-12/TO 5N3-3-10-1
PMCS PROCEDURES (continued)
H = Hours
A = After
B = Before
For Readiness Reporting
Interval
Equipment is not ready/
Item
Item to be Inspected Procedure
available if:
B
A
H
No.
NOTE
BE ALERT: If you find a fault
which you can fix, fix it. Check
out anything that seems wrong
or unusual.
Missing or loose hardware
1.
EXTERNAL STRUCTURES. ln-
q
p r e v e n t s proper use of
spect seating and stability of
mountings. Check for loose or
compass set.
missing hardware and replace
and tighten as necessary. Check
to see that the shock-mounted
components are securely
mounted with sufficient
clearance around components.
Check to see that all other com-
ponents are securely mounted.
and mechanical connection.
2.
Check each control for proper
Knobs, dials, or switches
q
mechanical action. Observe that
are missing or defective.
the mechanical action is
positive without backlash, bind-
ing, or scraping.
Defects exist which pre-
3.
Check to see that exterior sur-
q
f a c e s are free from all dirt,
vent proper operation of
g r e a s e , and moisture. Check
equipment.
general condition of each com-
ponent. Inspect for scratched
paint, missing screws, and bent
or broken hardware.
4.
Check to see that the indicators
Indicator face is broken or
q
q
are in good condition and that
dirty.
their glass surfaces are clean
and not cracked or damaged.
4-7