TM 55-1905-223-24-14
Section VI. PREPARATION FOR STORAGE OR SHIPMENT
2-29. Administrative Storage. Administrative storage of equipment issued to and used by Army activities will have
preventive maintenance performed in accordance with the Preventive Maintenance Checks and Services (PMCS) tables
before storing. When removing the equipment from administrative storage, the PMCS should be performed to ensure
operational readiness. Removal of components for shipment or limited storage is covered in paragraphs 2-11 through 2-
28. Use the following steps for repacking for shipment or short term storage.
a. Place all loose components in a plastic bag and secure the bag to the unit.
b. Pack the unit in a box using suitable protection.
c. Seal the box containing the unit and mark appropriately.
d. Do not store the unit in a place where moisture is present.
2-82