TM 55-1905-223-24-14
c. Assemble stuffing tubes (5) on electrical equipment cabinet and cables (6), (7), and (8).
d. Route cables (6, 7, and 8) into electrical equipment cabinet and connect to terminal board (4) TB1. Remove tags.
e. Dress cables inside electrical equipment cabinet and secure stuffing tubes (5).
f. Close cover (2) and secure with four captive thumbscrews (3).
g. On pilothouse IC/ELEX panel, set circuit breaker No. 1 (MK 27 GYRO PWR CONV UNIT) to ON. Remove "Out
of Service, Do Not Operate" tag.
h. On pilothouse dc panel, set circuit breaker No. 1F (GYRO PWR TRANSF UNIT) to ON. Remove "Out of
Service, Do Not Operate" tag.
i. Start compass (TM 55-1905-223-10).
2-73