ARMY TM 5-6675-308-12
MARINE CORPS TM 08837A-12/1A
Table 3-3.2. Mission Procedures (GPS) - Continued
Step
Reference
Status indicators
CDU data display
Operation action
no.
BATT
Disconnect vehicle power by setting PS
b.
VEHICLE circuit breaker CB2 to OFF.
PADS should remain operating.
CHRG
After 30 seconds of battery operation,
c.
set PS VEHICLE circuit breaker CB2 to
ON
Press ON/OFF
SAVE C-E
d.
Do not attempt to remove power or
force a system shutdown during the
PAUSE command. Memory data is be-
ing transferred during this time.
Press ENT
PAUSE (approx 40
e.
seconds)
f.
When display indicates "OFF" E, press
OFF "E"
ON/OFF
Press ENT
(All displays darken)
g.
NOTE
If, for security reasons, the operator
does not want to store the mission data,
the following shutdown sequence should
be followed.
Press ON/OFF
h.
SAVE C-E
i.
Press CLR
"OFF" C-E
Press ON/OFF
OFF "C-E"
j.
Press ENT
k.
(All displays darken)
l.
Turn off PS BATTERY and VEHICLE
circuit breakers CB1 and CB2
Turn off vehicle engine
m.
AFTER-OPERATION CHECKS AND
15.
SERVICES
Inspect for excessive accumulation of
a.
dirt and debris. Clear as necessary
Inspect for damage to primary pallet,
b.
battery box, CDU, and cables
Change 3
3-36.32