TM 11-6625-821-45
GENERAL SUPPORT TESTING PROCEDURES
AND DEPOT OVERHAUL STANDARDS
not vary the sequence. For each step, per-
form all the actions required in the Control
a. Test procedures are prepared for use by
Settings, columns; then perform each specific
personnel responsible for general support and
test procedure and verify it against its perform-
depot maintenance of electronics equipment to
ance standards.
determine the acceptability of repaired equip-
ment. These procedures set forth specific re-
4-2. Test Equipment, Tools,
quirements that repaired equipment must meet
and Materials Required
before it is returned to the using organization.
The test procedures are both general support
All test equipment, tools, materials, and
testing procedures and depot Overhaul stand-
other equipment required to perform the test
ards. A summary of the general support test
procedure given in this section are listed in the
following chart and are authorized under TA
procedures and depot overhaul standards is
1117, Signal Fiels Maintenance Shops, and
TA 11100 (1117), Allowances of Signal
b. Comply with the instructions preceding
Caps Expendable Supplies for Signal Field
the body of each chart before proceeding to
the chart. Perform each test in sequence. Do
Maintenance Shop, Continental United States.
a. Test Equipment.
b. Tools. No special tools are required.
(6) Wire, copper, insulated, stranded, 16
c. Materials.
AWG (20 feet long).
(1) Capacitor, 1,800 micromicrofarad 1
(7) Inductor, 22 microhenrys (three re-
percent.
quired).
(2) Connector, MS3106A-14S-5S.
(8) Wire, copper, insulated, stranded, 22
(3) clamp, AN3057-6A.
AWG (1 foot long).
(4) Connector, Bendix PT02A12-10P
(9) BNC connector (UG910B/U).
(two required).
d. Other Equipment.
(1) Fabricated cable for LOOP SIMULA-
(5) Wire, copper, insulated, solid, 20
AWG (1 foot long).